

Scope of works
- Strip out kitchen, two bathrooms and laundry.
- Structural, plumbing and electrical to a new plan.
- Two wet areas waterproofed and cured.
- Kitchen and joinery throughout.
- Flooring and full repaint.
The hard part
Every trade across the build in one home. The whole job lived or died on sequencing so nobody sat waiting.
Job typeFull home
PropertyDetached house
Duration12 weeks
SuburbEpping
ReferencePW-2408
Trades involved
CarpentryWaterproofingTilingPlumbingElectricalPlasteringPaintingFlooringJoinery

Behind the surface
The detail that lasts
The standard held on this job like every other. Built up layer by layer, the way it has to be.
