Scope of works
- Strip out to studs and slab.
- Re-set plumbing and electrical to a new layout.
- Waterproof to AS 3740, 150 mm turn-up.
- Screed to a 1:100 fall to the waste.
- Full-height tiling in the shower.
- Vanity, toilet, screen and tapware fit-off.
The hard part