

Scope of works
- Lift old carpet throughout.
- Level the subfloor to tolerance.
- Lay hybrid flooring with acoustic underlay.
- Repaint walls and trims.
The hard part
A rental turnover on a hard deadline between tenants. Six days start to finish with a new lease already signed.
Job typeFlooring
PropertyTownhouse
Duration1 week
SuburbCarlingford
ReferencePW-2439
Trades involved
FlooringPaintingCarpentry

Behind the surface
The detail that lasts
The standard held on this job like every other. Built up layer by layer, the way it has to be.
